How to Calculate Tonnage of Machine in HPDC

Calculating the tonnage of a High-Pressure Die Casting (HPDC) machine is essential to ensure the machine's capability matches the requirements of the casting process. The tonnage refers to the clamping force exerted by the machine to hold the die closed during the casting process. Here's a general method to calculate the tonnage of an HPDC machine:


Determine the projected area:

The projected area is the area of the parting line of the die. It can be calculated by multiplying the length and width of the parting line in square inches or square centimeters.


Determine the safety factor:

The safety factor accounts for additional force required to overcome factors like draft angles, ejector pins, and other resistance during the casting process. Typically, a safety factor of 1.5 to 2 is used.


Calculate the tonnage:

The tonnage can be calculated using the formula:

Tonnage = Projected Area x Safety Factor x Metal Pressure


The metal pressure is usually measured in pounds per square inch (psi) or kilograms per square centimeter (kg/cm²) and depends on the specific metal being cast. Metal pressure values can be obtained from material data sheets or by consulting with experts in the field.


Example Calculation:

Let's assume we have a projected area of 50 square inches, a safety factor of 1.5, and a metal pressure of 10,000 psi.


Tonnage = 50 sq in x 1.5 x 10,000 psi

Tonnage = 750,000 lbs


Therefore, the tonnage required for the HPDC machine in this example would be 750,000 pounds.


It's important to note that this is a simplified method, and the actual tonnage required may vary based on factors such as the complexity of the part, wall thickness, material properties, and process-specific considerations. It is recommended to consult with machine manufacturers, die casting experts, or utilize specialized software for more accurate tonnage calculations in real-world applications.